Pictures of the June 19th tower work

The first climber goes up while Frank(center) and the hard hats watch.


This is the jumper that supplies RF to the 222.1 antenna.
Note the center pin sticking way out.


Fran KA1HZL kept a contant vigil and handled the ropes for the whole job.


Bob on top and Frank below prepare to remove the broken PVC pipe
from 146.91.


Frank at the bottom of 146.91 hooking a line on the bottom.


Bob removing the rusted center U-bolts.


A close view of Bob having to really get out there to break off the ubolts.


Part of the ground crew preparing new PVC pipe to go up.
(Left)Tim N1PTZ ,(Center) Ed N1FGY, (right) Joe W1BS


Pipe cutting
Ed N1FGY, Tim KE3HT, Dick WA1AAU


The temporary 146.91 goes up.


Photo's credit Sigurd KJ1K